I realized after looking at the extra stuff I will be adding to the CV, that I might want to install a battery terminal bus bar for power distribution. Thinking of moving some of the cables from the starter solenoid to the bus bar. My problem is that I'm not electrically inclined; so I don't know how many amps I would need for the bus bar. Or if it's necessary to install one. Figured that since I have gone through 3 starter solenoids, I could take some of the load off of it. Good idea? Bad idea?